Skip to content

INDUSTRIAL INSPECTION SERVICES

Welding Procedure Qualification (PQR) Service

Proving a welding procedure specification (WPS) with a test piece: witnessing the welding, testing, evaluation and WPQR (PQR) approval.

TS EN ISO/IEC 17020TÜRKAK AB-0873-M
Welding Procedure Qualification (PQR) Service

Welding procedure qualification proves that the manufacturer's preliminary welding procedure specification (pWPS) produces welds with the required mechanical properties and quality. A test piece is welded to the standard and subjected to non-destructive and destructive tests. If the results conform, a welding procedure qualification record (WPQR / PQR) is issued and the approved WPSs can be used in production.

The service is carried out within the scope for which MEKATEST is accredited by TÜRKAK as a Type A inspection body under TS EN ISO/IEC 17020 (AB-0873-M). As a Type A inspection body we work as an independent third party, separate from both manufacturer and purchaser.

Procedure

  • Review of the pWPS and material certificates
  • Witnessing the welding of the test piece and recording parameters such as current, voltage, travel speed, preheat and interpass temperature
  • Non-destructive testing: visual, penetrant / magnetic particle, radiographic or ultrasonic testing
  • Destructive testing: tensile, bend, impact, macro examination and hardness (in our accredited laboratory)
  • Evaluation of results to the relevant standard
  • Issue of the WPQR (PQR) and approval of WPSs within the range of qualification

Standards in the Accreditation Scope

  • EN ISO 15614-1, -2, -3, -4, -6, -8, -11 – Welding procedure test
  • EN ISO 15613 – Qualification based on pre-production welding test
  • EN ISO 11970 – Qualification of welding procedures for production welding of steel castings
  • AD 2000 Merkblatt HP 2/1 – Welding procedure qualification for pressure vessels
  • ASME Sec. IX – Welding and brazing qualifications
  • AWS D1.1 / D1.5 / D1.6 – Structural welding of steel, bridges and stainless steel
  • API 1104 – Welding of pipelines and related facilities

Deliverables

Approved WPQR (PQR), non-destructive and destructive test reports, and approved WPSs. Please state the applicable standard, base material, welding process and thickness range in your request.